B) montáž — mírně akumulační systém, Instalace do betonu (samonivelační hmoty), Installation into concrete (self-levelling screed) – Fenix PSV Uživatelská příručka

Stránka 4

Advertising
background image

4

RECOMMENDED AND MAXIMUM OUTPUTS /

TABULKA DOPORUČENÝCH A MAXIMÁLNÍCH PŘÍKONŮ

* When cables are to be installed under tiles into the adhesive sealing cement, the space between them should not be more than 100 mm or
less than 40 mm. /

Při instalaci přímo pod dlažbu do lepicího tmelu by rozteč mezi kabely neměla být větší než 100 mm a menší než 40 mm.

b) Montáž — mírně akumulační systém

INSTALACE DO BETONU (samonivelační hmoty)

Nejprve si přečtěte Všeobecné podmínky.

V případě mírně akumulačního a poloakumulačního systému lze klást
topné kabely přímo na tepelnou izolaci (expandovaný polystyren –
max. zatížení kabelu 10 W/m, 100 W/m

2

;

extrudovaný polystyren

s Al roznášecí fólii – max. zatížení kabelu 15 W/m, 160 W/m

2

).

 

Betonová směs musí být natolik zhutněná, aby vrstva neobsahovala
vzduchové bubliny, kaverny apod. a zajišovala dokonalý kontakt s
topným kabelem. Hutnit nutno opatrně, ručně, aby nedošlo
k poškození kabelu. V žádném případě nepoužívat ponorné vibrátory.

Betonová směs musí obsahovat tzv. plastifikátory.

Při betonování je nutno dbát na skutečnost, že při přestávce delší
60minut se betonované plochy dokonale nespojí. Proto při delší
prodlevě je nutno vytvořit adhezívní spojovací můstek, např. penetrací
nebo jiným způsobem.

Při instalaci armovacího železa je nutno dát pozor, aby nedošlo k
poškození izolace kabelu.


b) Installation — system with moderate
accumulation of heat

INSTALLATION INTO CONCRETE (self-levelling screed)

Firstly, read General conditions.

In the case of partial storage and semi-storage systems it is possi-
ble to lay heating cables directly onto heating insulation (expanded
polystyrene – max cable load 10 W/m, 100 W/m

2

; extruded poly-

styrene with Al distribution foil – max cable load 15 W/m,
160 W/m

2

).

Concrete mixture has to be compacted to such extent that no air
bubbles, caverns etc. are present in the layer and so that it ensures
perfect contact with the heating cable. The compacting has to be
performed carefully and manually, so that the cable is not damaged.
In no case it is possible to use immersion vibrators.

The concrete mixture must contain so-called plastifiers.

In the course of concreting, it is necessary to pay attention to the
fact that a break longer than 60 minutes results in an imperfect
uniting of areas being concreted. So, in the case of longer pause, it
is necessary to create an adhesive connecting bridge, for example
by means of penetration or in another way.

Be careful when installing the reinforcing grid not to damage the
cable insulation.

FLOOR COVERING ROOM

PODL. KRATINA MÍSTNOSTI

RECOMMENEDED FLAT OUTPUT

DOPORUČENÝ

PLOŠNÝ PŘÍKON

W/m

2

MAXIMUM FLAT OUTPUT

MAX. PLOŠNÝ PŘÍKON

W/m

2

RECOMMENEDED LENGHT OUTPUT

DOPORUČENÝ DELKOVÝ PŘÍKON

W/m

NOTE /

POZNÁMKA

WOOD FLOOR

DŘEVĚNÁ PODLAHA

60 70 10

FLOOR TILES

DLAŽBA

80 -120

200

10 - 15

FLOOR TILES IN BATHROOM

DLAŽBA - KOUPELNA

130 - 180

300

10 - 15

Temperature of floor surface in rooms occupied

for long time periods may not exceed 27°C.

Teplota povrchu podlahy v dlouhodobě

obývaných místnostech nesmí překročit 27°C

LAMINATE FLOOR

LAMÍNÁTOVÁ PODLAHA

80 90 10